← Home
Service — Rework
PCB rework for BGAs up to 120 mm, backed by X-ray
Remove, reball and replace BGAs. Swap components, repair traces and run ECO wires, then verify the result with X-ray.
120 mmLargest BGA rework
Remove / Reball / ReplaceFull BGA scope
5+ daysStandard lead time, expedited available
WeekendsAvailable on request
X-ray QCBefore/after imaging with traceability
ECO workWires, traces, component changes
Why teams choose us
Feasibility is reviewed before any heat is applied
We check access, thermal mass and pad condition first. Scarce boards don’t become experiments
Proof, not promises
BGA work is imaged with X-ray before and after, and the images and records go back with the board
Rework instruction documentation
Every job follows written instructions, so the change can be repeated and traced
Capabilities
| Capability | Details |
|---|---|
| BGA | Removal, reballing and replacement up to 120 mm |
| Components | Failed-part and wrong-part replacement |
| Conductors | ECO wires; trace repair to your drawing |
| Verification | Post-work X-ray (Nicolet 2D / Nikon 3D) |
| Quantity | Single boards to large lots |
| Lead time | 5+ days standard; expedited available; weekends on request |
How it works
Document the board, change it and prove it.
Send the rework packageBoard and revision, serials, refdes, the failure or ECO, photos and criteria
Feasibility reviewAccess, thermal mass, site condition and any prior rework
Rework instruction documentationThe written process is approved before work starts
Perform the reworkRemove, reball or replace, or modify traces and wires to your drawing
Post-work X-ray and returnBoards and records come back together
Built for
Scarce prototypes
Recover boards instead of waiting for a respin
ECOs on built hardware
Wire and trace changes to a controlled drawing
BGA failure investigation
Before/after X-ray evidence
Frequently asked questions
How big a BGA can you rework?
Up to 120 mm. Feasibility depends on the board and its surroundings
How long does it take?
5+ days standard. Expedited service is available, and weekends are available on request
Will I get X-ray images?
Yes. Post-work X-ray is part of BGA rework, and images are available on request
Do you take single boards?
Yes, from single boards to large lots
