Parts kitting built around BOM control and machine-ready packaging

Zero silent substitutions and weekly Clear-To-Build reports, so you see the shortage before it becomes the build date.

ZeroSilent substitutions, ever
CommsShortage and Clear-To-Build reports
6+ channelsArrow, Avnet, Digi-Key, Mouser, Newark, America II
FIFOTraceability on all material
MSL verifiedDry-pack checked and preserved
Consigned OKTracked separately, $0 on the costed BOM
Digi-Key Electronics
Mouser Electronics
Arrow Electronics
Avnet

Why teams choose us

Your AML is the rule
Every alternate needs your written approval. No exceptions
Production kits and rework kits are different
Production kits hold full machine-feedable reels. Rework kits hold only the parts you need, plus flux, wick and reballing supplies
The suffix matters
We match manufacturer part numbers exactly, down to the packaging and plating suffix

Capabilities

BOM scrub Availability, EOL, MOQ, NCNR, lead time, packaging
Sourcing Approved distributors and your AML
Incoming checks Quantity, MPN, date code, documentation
Quality inspection Parts checked against PO for part correctness and correct markings
Moisture control MSL and dry-pack verification; baking when required
Reporting Weekly shortage and Clear-To-Build reports with dock dates
Material models Acronics-sourced, consigned or mixed

How it works

Every risk on the BOM surfaces before you commit spend.

Send the BOM and buying rulesBOM, quantity, AML, alternates, consigned list and required date
ScrubYou get a costed BOM plus EOL, MOQ, NCNR and long-lead risks
ApproveYour PO, plus written approval of any alternate or last-time buy
Source and trackOrders are placed and ETAs followed. Weekly shortage reports go out
Receive and verifyParts are checked on receipt, pass incoming inspection and are logged FIFO
Kit and releaseThe production or rework kit is staged and released at Clear To Build

Built for

Mixed consigned programs
Your silicon, our passives, one tracked kit
Long-lifecycle products
EOL and last-time-buy decisions made early
Medical & defense
Traceable, approval-documented purchasing

Frequently asked questions

Will you substitute a part?

Only with your written approval

Can we consign only the hard parts?

Yes. Consigned parts are tracked separately at $0

How do we see shortages?

In a weekly Clear-To-Build report showing the required quantity, the shortage, open orders and dock dates

Do you handle moisture-sensitive parts?

Yes. We verify MSL and dry-pack condition and bake parts when required