← Home
Service — PCB Fabrication

PCB fabrication for high-layer and HDI builds, managed from stack-up to delivery

Rigid, flex and HDI boards through local partners, with a stack-up review up front and nothing released without your approval.

52 layers370 mil test board built
3-dayAccelerated fabrication option
Rigid/Flex/
HDI
All three constructions
Megtron 8
Isola 408HR
High-performance laminates
One PM from fab to assy The team that knows your design answers the fabricator’s questions
Your approvalNo fab release without sign-off

Why teams choose us

Stack-up confirmed before you pay
We check material availability and construction with the fabricator before release, not after a hold notice
One thread from layout to fab
The team that knows your design answers the fabricator’s questions
Export-controlled routing available
ITAR jobs go to appropriate sources and are handled as quoted

Capabilities

Constructions Rigid; flex; HDI
Layer count Double-sided through 52 layers demonstrated
Thickness Up to 370 mil demonstrated
Laminates Megtron 8; Isola 408HR; others confirmed per stack-up
Lead time 3-day accelerated; about 1 week standard
Quality ISO 9001:2015, ISO 13485:2016, ITAR registered

How it works

Most fab delays start with an unanswered question. We ask ours first.

Send fab dataGerbers, fab drawing, drill data, stack-up and requirements
Completeness checkYou get technical questions back while the schedule can still absorb them
Match to a partnerQuoted through a local or export-controlled source
Approve releaseYou sign off on the final package
Build and verifyThe build is tracked, receives incoming verification and ships with the quoted certificates

Built for

Your stack-up has never been built before
Send us the design before you send the order we review it first
Your fab house keeps saying we’ll see
Microvias flex sections tight tolerances we raise the questions early not after the boards ship
You need boards fast and you need to approve them
Three days accelerated about a week standard nothing gets released without your sign-off

Frequently asked questions

What do you need to quote?

At minimum, Gerbers and a fab drawing. For complex boards, also send the stack-up, impedance, via and finish requirements

How fast?

Three-day accelerated service is available. Standard is about one week, starting from accepted data

Which laminates?

Megtron 8 and Isola 408HR are common. Others are confirmed per stack-up

Can I see the fab package before it’s released?

Always. Nothing is released without your approval